An old tabletop in need of some updated elegant legs.
Septic System
Yet another step closer to finishing Seven Corner Cottage. The septic system was dug out, filled in, pipes installed, and tank dropped into place. It's always great to know that there are more things that are completed and can be checked off the long list of things to do. Next up, HVAC.
Rustwood Wall Art
Designing and constructing a concrete panel art piece on the southern wall of Rustwood.
Closed In
Seven Corner Cottage is finally completely closed in. In order to be prepared for the winter, we needed to weatherseal the house. Now we can contuniue to work on the interior without much regard for the cold.
Rustwood Roof
Installing the heavy gauge metal roofing on Rustwood.
Walls and Beams
Putting up the wall and dropping in the beams for the second floor of Rustwood.